Our Brands

My Documents

Choose another country or region

Welcome to the ASCO Website

Welcome to our website.
Filters 0

Items found: 56

Filters
Clear all
Categories

Filters Clear all
Categories

Applications Notes
TechXpert Video
Technical FAQs

Items found: 56

  • How ASCO Power Control Systems respond to failure events

    Power Control Systems from ASCO Power take different actions when an engine fails or fails to start. The devices have unique features that can help optimize backup power systems.

    TechXpert Video

  • A primer on Component Importance Factor

    What's the difference between Seismic Analysis Ip=1.0 and Ip=1.5? Learn all about a project's Component Importance Factor (Ip) in this video.

    TechXpert Video

  • Benefits of incorporating generator controls in the switchgear

    There are advantages to including generator control in the switchgear instead of having all the controls at the generator. Find out how this helps optimize backup power systems.

    TechXpert Video

  • Can you parallel two different size generators?

    Find out why matching the generator pitch is important when paralleling different types of generators.

    TechXpert Video

  • What does PLC mean?

    Learn about Programmable Logical Controllers (PLCs) and the value of dedicated generator PLCs for each generator with a CPU.

    TechXpert Video

  • Shake, Rattle, and Roll - Seismic Options for ASCO Transfer Switches

    Elevated risks for earthquakes affects regions around the world. This article summarizes the role of codes and testing required to offer seismic-rated transfer switches and other power equipment.

    Applications Notes

    Read Now
  • Arc Flash Protection Options for Switchgear

    What are the arc flash reduction methods described by NEC Code 2020 for low and medium voltage switchgear?

    TechXpert Video

  • UL1558 Requirements for Switchgear Barriers

    What does UL 1558 require for ASCO switchgear?

    TechXpert Video

  • Types of Operator Interface Terminals

    Are ASCO Power Control Systems offering Operator Interface Terminals (OIT) for the transfer switch?

    TechXpert Video

  • Masterpact MTZ Circuit Breakers

    Why can’t you install 5.0P or 6.0P trip units for Schneider Electric Masterpact MTZ Circuit Breakers?

    TechXpert Video

  • NEC 2020 Load Shed Requirements

    Will NEC 2020 require a load shed if the generator is removed from the bus bar and the remaining generators are not overloaded?

    TechXpert Video

  • The Power of a QR Code

    Accessing transfer switch documentation anytime anywhere is now possible with QR Codes. Use the Facility Expert app or a handheld device with a QR reader to find documents fast. Read this Application Note to learn more.

    Applications Notes

    Read Now
  • Four Reasons to Specify Quick Connects for Backup Power

    Facilities need a fast simple way to connect temporary generators and load banks to their power systems. Here are the four reasons why.

    Applications Notes

    Read Now
  • Benefits of a Transfer Switch Monitoring Portal

    Facility personnel often lack real-time, critical power information. Located between power sources and loads, transfer switches are perfect for accessing this information. Learn how the ASCO Power Technologies 5170 Communication Module turns switches into power information portals.

    Applications Notes

    Read now
  • Generator Connection to Bus Bar

    Is there a specific time for parallel generators to connect to the bus bar?

    TechXpert Video

  • Redundant Master Programmable Logic Controller

    Are Redundant Master Programmable Logic Controllers (PLCs) beneficial for the transfer switch?

    TechXpert Video

  • Routing Power Cables

    Can we bring the power cable directly into the switchgear section in which they are to be terminated?

    TechXpert Video

  • Power Control System Products

    What are the specific available ASCO products in Power Control Systems (PCS)?

    TechXpert Video

  • Hardwired Manual Parallel Circuit

    How can we close all portable generator circuit breakers from one location by using a hardwired manual parallel circuit?

    TechXpert Video

  • Quick Connect Enclosure

    Can I get a Manual Transfer Switch with quick connects in 4x enclosure?

    TechXpert Video

  • Canadian standards regarding Transfer Switches

    Is it necessary to have a circuit that will trip the breakers feeding transfer switch equipment that operate in a closed transition mode?

    TechXpert Video

  • Transfer Switch & Generator Neutral

    Do breakers on load connections to transfer switches need to be 4 pole breakers?

    TechXpert Video

  • 200 Amp Transfer Switch & WCR Rating

    Can I get a 200 A transfer switch that has a 200kW WCR rating at 480V?

    TechXpert Video

  • Monitoring the Electrical Power System

    If installation will have an Electrical Power Monitoring System should each source be monitored?

    TechXpert Video

  • Monthly Maintenance & Power Failures

    How do you ensure the generator does not get overloaded if a power failure occurs during monthly maintenance?

    TechXpert Video

  • Space Considerations in an Electrical Room

    Are there best practices for space consideration in electrical room for transfer switches?

    TechXpert Video

  • Site Specific Warning Labels

    Do Transfer Switches get shipped with site specific Arc Flash Warning labels?

    TechXpert Video

  • Applications for Moveable Load Banks

    Moveable loads offer deployment flexibility. Read this brief for five examples.

    Applications Notes

    Read Now
  • Bypass Isolation Transfer Switch and NEC2020

    Does NEC 2020 require a Bypass Isolation Switch for Installation with a single ATS feeding COPS loads?

    TechXpert Video

  • Transfer Switch De-Rating

    Will the transfer switch de-rate if the emergency side generator can’t load full supply?

    TechXpert Video

  • SERIES 300 Event Log

    Which Automatic Transfer Switch should I buy as an optional accessory to read the event log captured by the SERIES 300 Group G Controller software?

    TechXpert Video

  • UPS Power Supply with Closed Transition

    Will a UPS Power Supply be needed along with a Closed Transition Transfer Switch?

    TechXpert Video

  • Load Shed Signal Overview

    What does a load shed signal do to prevent overload scenarios?

    TechXpert Video

  • NTS and Switching to Power Source

    Can Non-Automatic Transfer Switch (NTS) automatically transfer to the alternative source of energy when the preferred source goes dead?

    TechXpert Video

  • Comparing NTS, ATS, and MTS

    Why is the Manual Transfer Switch (MTS) different than Non-Automatic Transfer Switch (NTS) & Automatic Transfer Switch (ATS) regarding its operation?

    TechXpert Video

  • NTS and Load Disconnect Positions

    How many transition modes can be provided via Non-Automatic Transfer Switch (NTS) for a load disconnect position during transfer?

    TechXpert Video

  • What are the basic controls on the Group G Controller?

    Technical FAQs

  • How do I operate Model 920 using 3-wire control?

    Technical FAQs

  • Can a 3-PH Portable Load Bank be used on Single Phase Application?

    Technical FAQs

  • Transfer Switch Feature 1 Time-Delay

    What provide the feature 1 Time-Delay in ASCO Controllers for overcurrent protection?

    TechXpert Video

  • New Start Engine Signal Code

    What is the new requirement in the NEC Code Book regarding the new start engine signal?

    TechXpert Video

  • Transfer Switch Phase Angle Degree Setting

    What is the goal of the ASCO Controller when the phase angle is less than 60 degrees?

    TechXpert Video

  • Benefits of Bypass Transfer Switches

    With having benefits like testing, inspection, and maintenance, what is another purpose of the bypass switch?

    TechXpert Video

  • Integrate Temp Power into Multiple Parallel Generators

    Which ASCO Equipment should I use when more paralleled generators have to accept the required load?

    TechXpert Video

  • More Load. Less Generator.

    Temporal sequencing of load circuits using automatic transfer switches can make generator capacity go further. Read this Application Note to learn how.

    Applications Notes

    Read Now
  • Energy-Reducing Maintenance Switch Option

    Is ASCO Energy-Reducing Maintenance Switch along with the local status indicator enough for a service entrance transfer switch?

    TechXpert Video

  • Cable Bend Access in Enclosure

    Why doesn't the ASCO Transfer Switch come in a smaller enclosure?

    TechXpert Video

  • Quick Connect Short Circuit Rating

    Why is the lower short circuit ratings caused by Series 16 quick connects not a major issue when connected to a Manual Transfer Switch?

    TechXpert Video

  • Dual Purpose Quick Connect

    Why should I use ASCO Dual Purpose Quick Connect Power Panel (QCP) instead of the Single Quick Connect Power Panel?

    TechXpert Video

  • Transfer Switch Selection with Large Motor Load

    Which type of transfer switch will fit for a larger motor load up to 25 HP or greater?

    TechXpert Video

  • ASCO 6180 load bank testing a diesel generating set

    Three Ways to Optimize Efficiency and Reduce Emissions

    Running generators unnecessarily uses excess fuel, increases emissions, and increases costs. Here are three ways to avoid inefficiencies and unnecessary expenses.

    Applications Notes

    Read Now
  • 5 Advantages of the 5101 Engine Start Monitoring System

    Backup generators won’t backup anything if they never receive a start signal. ASCO Power Technologies’ 5101 Engine Start Circuit Monitoring System helps eliminate surprises.

    Applications Notes

    Read Now
  • Where do I connect my engine start wires to transfer switches? 

    Technical FAQs

  • Why do I need a Generator PLC if there is a Master PLC for my ASCO PCS?

    Technical FAQs

  • How do I connect wireless control to a Load Bank?

    Technical FAQs

  • See the full Technical FAQ video playlist

    Technical FAQs

    Watch Now
No items match your selection Check selected filters Reset filters