Need a technical document?
Search our download centre to find drawings, manuals and data sheets for your product.
When real-time demand exceeds generator capacity, loads must be connected or disconnected according to load priority to avoid generator overload. ASCO's 5800 SERIES Load Management Units automatically supervise ATS transfers to the emergency source according to assigned priorities. These units optimise capacity usage while avoiding overload.