ASCO Case Study: Large Mid-Atlantic Hospital
A healthcare provider planned to construct a new, 170-bed, $700 million facility in the Washington, D.C. area. A robust backup power system was needed to mitigate and avoid the risk and consequences of power disruption to life-safety and critical systems.
Date : 07/01/2019
Type : Customer Success Stories
Languages : English
Latest Version : 25
Document Number : TS-CS-ASCOMIDATLHOSP
Date : 07/01/2019
Type : Customer Success Stories
Languages : English
Latest Version : 25
Document Number : TS-CS-ASCOMIDATLHOSP
Document title
Date
Version
Languages
Document title
Product Ranges:
ASCO 7000 SERIES Low-Voltage Power Control System