TCO Analysis of a Traditional Data Center vs. a Scalable, Prefabricated Data Center White paper | ASCO Power Technologies

Our Brands

My Documents

Welcome to the ASCO Website

Welcome to our website.

TCO Analysis of a Traditional Data Center vs. a Scalable, Prefabricated Data Center

Standardized, scalable, pre-assembled, and integrated data center facility power and cooling modules provide a “total cost of ownership” (TCO) savings of 30% compared to traditional, built-out data center power and cooling infrastructure. Avoiding overbui

Date : 07/31/2014 Type : White paper
Languages : English Latest Version : V1
Document Number : SPD_WTOL-8NDS37_EN

Date : 07/31/2014 Type : White paper Languages : English Latest Version : V1 Document Number : SPD_WTOL-8NDS37_EN
Document title Date Version Languages
Document title
loader-lg loader-sm