Effective turbine controls for cogeneration facilities
This paper focuses not on turbine replacement, but on the upgrade/ replacement of the integrated governor and excitation system controls. In many instances, a control system upgrade will extend the life of existing turbines, avoiding costly refurbishment
Date : 10/03/2016
Type : White paper
Languages : English
Latest Version : 1.0
Document Number : PAS_63680_CPM16067
Date : 10/03/2016
Type : White paper
Languages : English
Latest Version : 1.0
Document Number : PAS_63680_CPM16067
Document title
Date
Version
Languages
Document title